Pages

Friday, April 29, 2016

Kitchen Remodel ~ Step Two




The kitchen remodel is going well. We have completed step two which was to take out the façade drop down ceiling. Thanks to the 1980’s interior design fad for drop-down ceilings the entire 8 x 10 foot galley style kitchen had a ceiling that was only 7 feet tall with florescent lights defused by crystal plastic panels in the center. Oh so lovely. Not!

This was a large undertaking, and a huge contributor to our stalling and delaying starting this step but we were able to keep the mess to a minimum.

Now the ceiling is set at the full 8 feet and the cupboards will be ceiling height with crown molding at the top. Next step sheetrock, mud & tape, and painting.

Again my apologies for the photos poor quality, they are from my cell phone camera that seems to be failing.

Happy Friday and have a GREAT weekend!



No comments:

Post a Comment

Thanks for leaving a comment it is great to hear from you!